Wednesday, February 15, 2017

C5. Inspect and test switches, connectors, and wires of starter control circuits; determine needed action. P-2

I accomplished this task by performing starter control circuit voltage drop tests. I did this by connecting my positive lead of my multi meter to the positive battery terminal, and my negative lead to the starter solenoid connection on the starter. I then had my friend Kevin Semmens turn the starter over after I disabled the fuel delivery system. I also learned how to do this by completing the starter system diagnosis modules on Argo.

No comments:

Post a Comment